纺织banner
  • 9860 series—Double station
  • 9660 series—Crawler line
model Applicable temperature Melt viscosity @130℃ Suitable production line
PUR 20~41℃ 4000~6500 Track wire
18~28℃ 4000~6500
10~25℃ 4000~6500
20~41℃ 4000~8000 Duplex
18~28℃ 4000~8000
10~25℃ 4000~8000

Refrigerator door panel technical requirements

Common substrates: ABS, PVC, aluminum alloy, ink glass
 
Hard requirements
  • quickly positioned, high initial strength, no flashing, no side slipping,
  • excellent low temperature performance, flow to the next foaming process in 30 minutes,
  • after curing, the colloid has
 
Operational requirements
  • good strength and thermal stability, otherwise the wire drawing affects the production odor and greatly affects the comfort of workers.
  • When the temperature is lower than 18℃, preheating should be turned on.

Suitable for double stations and tracked wires

One-component moisture-curing polyurethane hot melt adhesive does not contain any solvents and volatiles, has a short positioning time, strong colloid after curing, and excellent high and low temperature resistance, and is suitable for bonding between plastics/metals/glass. It can be used to bond refrigerator columns to silk-print glass, microwave oven shells and glass panels and other products.
 
The workplace requires clean, tidy, ventilated and good lighting. The temperature of the workplace is 7-41℃ and the humidity is 30-80%. Preheating is required when the room temperature is below 18°C.
 
Before applying glue, the workpiece should be inspected first. The qualified workpiece should be placed in the designated position of the workbench as required to ensure that the door frame and glass surface are free of dust, oil, water stains, or damage. If there is oil stains and low-temperature condensation mist, it must be removed before applying glue.
Glue application amount: 10~13g/meter, the width after glue is 6-8mm, the center of the glue is 8-12mm away from the edge, after pressing, the width of the glue strip is about 10~20mm, and the thickness of the glue layer is about 0.6~0.8mm.

Base material

The surface of the substrate should be free of oil, dust, plasticizer, mold release agent and other contaminants to ensure that the surface is clean and dry, and the dyne value should be ≥38.
Substrates with dyne value <38 can be mass-produced if they can pass the test and have been repeatedly verified.
If the substrate with a dyne value is less than 38, if it cannot pass the test, try to pretreat the substrate and then bond the test.

Temperature setting

Grille Cylinder/Pressure disc Hose Glue gun
120℃ 125-135℃ 140-150℃ 130-140℃
 
Shut down and maintain
 
For medium and short-term shutdown (<4 days), it is recommended to use butter at the nozzle and seal it with aluminum foil tape; if the machine is shut down for a long time (>4 days), it is recommended to use hot melt cleaning agent to clean the equipment from the cylinder to the nozzle.
Assembly and pressing
 
After the glue is applied, the glass should be bonded to the glue frame immediately, and it can also be left to dry for a certain period of time, but it must be bonded within a certain period of time (20℃-35℃ degrees Celsius ≤1min, 6℃-20℃≤1min, and the bonding can achieve better bonding effect immediately after glue).
 
The pressing time is ≥10s, the air pressure is > 0.4MPa, the pressing equipment surface must be closely fitted with the glass surface. If there are uneven glue frames, the pressing time must be increased as appropriate.
The specific pressing time can be increased according to actual conditions.
 
Time from glue to vertical release: >3min

Telephone

0512-56885350
Copyright © 2025 Suzhou Geshichuang Materials Technology Co., Ltd.

Product Center